“Development of working project documents of Wastewater Treatment Plants in 3 cities (Gadabay, Gazakh and Tartar)”

“Design of self-flowing sewage line, pressurized sewage line and sewage pumping station on the residence under construction on 20 hectares in the western part of Hovsan settlement, Surakhani district, Baku”

“Design of hydrotechnical facilities in the Atbulag canal and Pirsaat river bed in connection with the water supply of the pumping station for the irrigation water of the settlement consisting of 101 individual residential houses inhabited by internally displaced persons in Hajigabul district”

Development of execution plans for “design, supply and installation of wastewater treatment plant in Gazakh district”

“Design of the external water line of the residential complex under construction at the address "22", 12th km of Zigh highway-Airport, Hovsan settlement, Surakhani district, Baku”

“Basgal” State Historical and Cultural Reserve

Laying the external water line of the residential complex built at 12th km 22 of Zigh Highway-Airport, Hovsan settlement, Surakhani district, Baku - Author's supervision

“Oazis Bravo Market Project/Relocation of Sewerage Collector”

“Chobanzade Bravo Market Project/Design of Sewage Collector Relocation”

“Lokbatan Plot Bravo Market Project/Design of Sewage Collector and Waterline”

“The project of relocation of existing sewerage and water lines from the territory of the residential complex to be built on a 23.25 ha plot of land in the western part of Hovsan settlement, Surakhani district, Baku”

“Development of the working project documents of Pumping Station and Pressure line within the framework of the Wastewater Treatment Plant Project of Gazakh city”

Oazis Bravo Market Project/Design of Sewage Collector and Waterline

Designing Water Treatment facilities of Yevlakh city

“Relocation of existing water and sewage lines on the territory 18.81 ha of the residential complex in the western part of Hovsan settlement, Surakhani district, Baku” - Author's supervision

Provision of planning services of water, sewerage and irrigation systems within the framework of the project “Preparation of general plan of territories liberated from occupation”

“Design of the external water supply and sewage systems of the "Scientists Town" complex built for employees of the Azerbaijan National Academy of Sciences in Saray settlement, Absheron district”

“Construction of clarifier (water treatment plant) on Chubek canal in Mir Said Ali Khamadoni district of Khatlon region” Preparation of scientific and technical report based on the data of experimental studies of hydraulic washing of sludge settled in the chambers of clarifier

“Designing external water supply and sewage systems of Sumgayit, Bina airport and Shamkir Bravo markets”

Preparation of project documents for water supply of livestock complex located in Shamakhi district

Preparation of project documents for the reconstruction of the Jalal ditch in order to improve water supply of arable lands in the Ashaghi Oysuzlu village, Tovuz district

Preparation of project documents to improve water supply of arable lands of Hajialili village, Tovuz district

Preparation of project documents for improving water supply of arable lands and backyards of Aghdam village, Tovuz district

Preparation of project documents for providing irrigation water to backyards of Garabulag village, Oguz district

“Conducting a technical and economic assessment for rehabilitation of the Pirsaatchay reservoir in Hajigabul district”

Provision of task services on projects implemented by “Agro Fresh” LLC

Preparation of project-estimate documents for external water supply of modern tourism infrastructure around the mud volcanoes located in Absheron district

“Preparation of project documents in order to supply water to the territory consisting of 1400 ha arable land and dairy farm in Agsu district”

“Preparation of concept project documents for Wastewater Treatment Plants with a volume of 100,000 m3/day each in Almalyk and Angren of the Republic of Uzbekistan”

“In order to ensure the stability of water supply of the Shusha, conducting hydrological research works in the streams of Zarisli and Gargar rivers, designing temporary water intake system and pumping station”

“Supplying water to the Creative-Recreational Complex and 9 villages located in Shabran district”

“Designing Wastewater Treatment Plant with productivity of 10,000 m3 per day in Bilasuvar”

“Preparation of new project-estimate documents for external water supply of modern tourism infrastructure around the mud volcanoes located in Absheron district”

“Creation of water supply, sewerage and rainwater systems according to the new master plan of Fuzuli city”

“Development of the Technical and Economic Justification of reservoir on the Zarisli river”

“Bilgah-Pirshaghi Eastern sewage collector. On the first stage”